Context: The Kishau Multipurpose Dam on the Tons river, a ₹15,000-crore National Project on the Himachal Pradesh–Uttarakhand border, was in the news in September 2026 as States moved to finalise cost-sharing and land acquisition. It is one of three storage projects planned in the upper Yamuna basin to give Delhi and the north-western States assured water.
Key Features
- A 232.6-metre-high concrete gravity dam with 422 MW of hydropower capacity.
- Host States: Himachal Pradesh and Uttarakhand; beneficiaries: Uttar Pradesh, Haryana, Rajasthan and Delhi.
- About 2,950 hectares may be submerged.
- As a National Project, the Centre bears 90% of the cost of the water (irrigation and drinking water) component.
The Upper Yamuna Agreement
- Signed on 12 May 1994 by Himachal Pradesh, Uttar Pradesh (then including Uttarakhand), Haryana, Rajasthan and Delhi.
- Allocates the utilisable surface flow of the Yamuna up to Okhla — about 11.983 BCM — among the basin States, and provides for storage projects.
- Upper Yamuna River Board (1995) under the Ministry of Jal Shakti regulates allocation.
- The three storage projects: Renukaji (on the Giri, Himachal Pradesh), Lakhwar (on the Yamuna, Uttarakhand) and Kishau (on the Tons).
Static GK Connect — the Yamuna
- Source: Yamunotri glacier on the Bandarpunch range (Uttarakhand); joins the Ganga at Prayagraj (Triveni Sangam).
- Tributaries: Tons (largest, from Bandarpunch), Giri, Hindon, Chambal, Sindh, Betwa and Ken (the Chambal is the longest).
- The Tons is the largest tributary of the Yamuna and is fed by Har-ki-Dun glacier region streams.
- National Projects scheme (2008): 90% central grant for the irrigation and drinking water component of selected inter-State and large projects — 16 projects, including Kishau, Renukaji, Lakhwar, Polavaram, Ken-Betwa and Shahpurkandi.
- Hydropower: projects above 25 MW are "large hydro"; large hydro was declared renewable energy in 2019.
Concerns
- Seismicity and slope stability in the Himalaya; displacement and loss of forests; downstream ecological flows.
- Inter-State disputes on cost-sharing and power benefits.
Exam Angle — Prelims & Mains
- UPSC PYQ Link (Mains 2020, GS Paper 1): "The interlinking of rivers can provide viable solutions to the multi-dimensional inter-related problems of droughts, floods and interrupted navigation. Critically examine."
- Practice Mains Question (GS Paper 1, 10 marks, 150 words): Why are storage projects in the upper Yamuna basin important for north-west India, and what are the concerns associated with them?
- Practice Prelims MCQ: Consider the following pairs of projects and rivers:1. Kishau : Tons2. Renukaji : Giri3. Lakhwar : YamunaHow many of the pairs given above are correctly matched?(A) Only one(B) Only two(C) All three(D) None
Show answer
Answer: (C) All three — Pair 1 is CORRECT — Kishau is on the Tons. Pair 2 is CORRECT — Renukaji is on the Giri in Himachal Pradesh. Pair 3 is CORRECT — Lakhwar is on the Yamuna in Uttarakhand.
- Practice Prelims MCQ: Consider the following pairs of projects and rivers: