Read time3 min

Why in News: The Union Cabinet approved the Green Energy Corridor Phase-III (GEC-III) scheme on 30 September 2026 with an outlay of ₹1,86,405 crore — ₹1,36,378 crore for strengthening intra-state transmission systems and ₹50,000 crore for 50 GWh of battery energy storage. It aims to evacuate up to 135 GW of renewable energy by 2032–33, with central financial support of about ₹54,082 crore. It is the first phase of the programme to include dedicated storage.

Key Features

  • Intra-State Transmission System (InSTS): new lines and substations so that solar and wind power from resource-rich districts can reach consumers.
  • Battery Energy Storage Systems (BESS): 50 GWh at generator ends, congested nodes and load centres — to manage intermittency, evening peaks and grid congestion.
  • Implementation by State transmission utilities with central grants; completion by 2032–33.

Why Transmission Is the Bottleneck

  • India’s non-fossil capacity crossed 50% of installed capacity in 2025, but curtailment and delayed evacuation idle many projects.
  • Renewable energy is concentrated in Rajasthan, Gujarat, Karnataka, Tamil Nadu and Ladakh, far from demand centres.
  • Solar output peaks at midday while demand peaks in the evening — storage shifts energy across hours.
  • Land acquisition and right-of-way delays slow lines.

Significance

  • Supports the target of 500 GW non-fossil capacity by 2030 and net-zero by 2070.
  • Boosts domestic battery manufacturing linked to the PLI scheme for Advanced Chemistry Cells and viability-gap funding for BESS.
  • Reduces reliance on coal for peak demand.

Concerns

  • Battery supply chains depend on imported lithium and cells, largely from China.
  • Financial health of State utilities (DISCOMs) affects implementation.
  • Safety, recycling and end-of-life management of batteries.

Static Background — Grid and Renewable Energy

  • GEC Phase-I (from 2015): intra-state transmission in eight renewable-rich States — Tamil Nadu, Rajasthan, Karnataka, Andhra Pradesh, Maharashtra, Gujarat, Himachal Pradesh and Madhya Pradesh — with KfW (Germany) support; Phase-II (approved 2022) covers seven States for about 20 GW.
  • National grid: “One Nation, One Grid, One Frequency” achieved in December 2013 when the southern grid was synchronised; managed by Grid Controller of India (Grid-India).
  • Inter-State Transmission System (ISTS) charges are waived for renewable projects commissioned till mid-2025 (phased out after).
  • India’s NDC (2022 update): 50% of installed capacity from non-fossil sources by 2030; 45% reduction in emissions intensity of GDP from 2005 levels.
  • Pumped storage and batteries are the two main storage technologies; the Central Electricity Authority projects large storage needs by 2032.
PhaseApprovedFocus
GEC-I2015Eight States’ intra-state lines (with KfW)
GEC-II2022Seven States, about 20 GW
GEC-III2026135 GW evacuation + 50 GWh BESS

Exam Angle — Prelims & Mains

  • UPSC PYQ Link: Prelims has asked about the “Green Energy Corridor” and India’s renewable targets; Mains GS-3 on grid integration of renewables.
  • Practice Mains Question (GS Paper 3, 15 marks, 250 words): “India’s energy transition is now a transmission and storage challenge more than a generation challenge.” Discuss with reference to the Green Energy Corridor Phase-III.
  • Prelims Angle: phases, States covered and the storage component.
    • Practice Prelims MCQ 1: Consider the following statements about the Green Energy Corridor programme:
      1. It focuses on transmission infrastructure for evacuating renewable power.
      2. Phase-III is the first phase to include a dedicated battery energy storage component.
      3. It is implemented only by the Power Grid Corporation through inter-State lines.
      Which of the statements given above are correct?
      (A) 1 and 2 only
      (B) 2 and 3 only
      (C) 1 and 3 only
      (D) 1, 2 and 3
      Show answer
      Answer: (A) 1 and 2 only — Statement 1 is CORRECT and Statement 2 is CORRECT. Statement 3 is INCORRECT — Phases I to III mainly strengthen intra-State systems through State transmission utilities.
    • Practice Prelims MCQ 2: India’s national grid became “One Nation, One Grid, One Frequency” when which regional grid was synchronised with the rest in 2013?
      (A) Northern
      (B) Eastern
      (C) North-Eastern
      (D) Southern
      Show answer
      Answer: (D) — The Southern grid was synchronised in December 2013, completing the single national grid.

More Indian Economy from October 2026

Written by the EdiShorts editorial team from official and public sources. Check the latest position before quoting figures in the exam.