Disaster preparedness is the first step in any disaster management process. Explain how hazard zonation mapping will help disaster mitigation in the case of landslides.
Make clear how and why hazard zonation mapping works as a mitigation tool, step by step, with Indian examples; a description of landslides alone will not do.
Common trap: Weak answers list causes of landslides. A top answer explains what a landslide hazard zonation map is (factors, scales, zones, agencies), then shows how each zone drives specific mitigation decisions on land use, infrastructure, early warning and response.
SyllabusDisaster and disaster management.
Model answer
15 marks · 250-word limitPreparedness means knowing in advance where a disaster is likely to strike. About 12.6 per cent of India's land area, roughly 0.42 million sq km across the Himalayas, the North-East, the Western Ghats and the Nilgiris, is prone to landslides, which makes hazard zonation mapping the starting point of landslide risk reduction.
- Map causative factors: rock, slope, relief, land use, groundwater
- Rate and combine them (LHEF scheme)
- Classify very high to very low hazard zones
- Regulate land use and design infrastructure
- Target monitoring, early warning and drills
What landslide hazard zonation mapping is
- Method: Under BIS code IS 14496 (Part 2): 1998, factors such as lithology, structure, slope, relative relief, land cover and hydrogeology are rated and summed, with rainfall and seismicity as triggers, to divide terrain into hazard classes.
- Scales: Macro-zonation at about 1:50,000 suits district and regional planning; micro-zonation at larger scales guides individual towns, roads and slopes.
- Institutions: The Geological Survey of India is the nodal agency for landslides and runs national susceptibility mapping; NDMA's 2009 guidelines and its National Landslide Risk Management Strategy (September 2019) make mapping the first pillar.
How zonation helps mitigation
- Land-use regulation: Very high hazard zones can be kept free of new settlement and quarrying, while moderate zones get slope-specific building bye-laws and drainage rules.
- Safer infrastructure: Roads, railways, hydro projects and pipelines can be aligned away from unstable slopes, or protected by retaining walls, rock bolting and drainage where avoidance is impossible.
- Monitoring and early warning: Instruments and rainfall-threshold warnings can be concentrated on the highest-risk slopes rather than spread thinly.
- Bio-engineering and treatment: Afforestation, check dams and surface drainage can be prioritised for degraded high-hazard catchments.
- Response planning: District disaster management plans can pre-position NDRF/SDRF teams, identify safe shelters and plan evacuation routes for mapped villages.
Lessons from recent landslides
- Cost of ignoring hazard: The Malin landslide in Pune district (July 2014), Kodagu (2018) and Puthumala (Wayanad) and Kavalappara (Malappuram) in Kerala (August 2019) hit settlements on steep, rain-soaked slopes that zoning should have flagged.
- Gaps: Maps are often not translated into binding master plans, local-language risk maps for panchayats, or updated after new road cutting and deforestation.
A hazard zonation map turns uncertain danger into a planning instrument. Its value depends on being made binding in land-use and building rules, updated regularly and shared with communities, in line with the Sendai Framework's priority on understanding risk.
Read more — sources
- OfficialNDMA — National Landslide Risk Management Strategy, September 2019
- OfficialNDMA — National Disaster Management Guidelines: Management of Landslides and Snow Avalanches, 2009
- OfficialBureau of Indian Standards — IS 14496 (Part 2): 1998, Preparation of Landslide Hazard Zonation Maps in Mountainous Terrains
- NCERTIndia: Physical Environment (Class XI) — Ch. 6, Natural Hazards and Disasters