Examine the potential of wind energy in India and explain the reasons for their limited spatial spread.
Assess the potential with evidence, then probe the reasons for the uneven spread in detail, covering both natural and policy factors.
Common trap: The second part carries most of the marks. Top answers tie the spread to wind regimes and terrain first, and then to grid, land, tariff and ecological constraints, using named states and sites rather than a generic list.
SyllabusDistribution of key natural resources across the world (including South Asia and the Indian sub-continent); factors responsible for the location of primary, secondary, and tertiary sector industries in various parts of the world (including India).
Model answer
10 marks · 150-word limitBy March 2022 India had about 40 GW of wind capacity, the fourth largest in the world. Yet the National Institute of Wind Energy (NIWE) puts onshore potential at about 695 GW at 120 m hub height, so barely a twentieth is tapped, mostly in a few states.
- Strong winds only on coasts, gaps and Thar
- Farms cluster in TN, Gujarat and a few states
- Local grid saturates; curtailment rises
- Weak DISCOMs delay payments
- Investment shifts to cheaper solar
Potential
- Onshore: High-wind zones lie on the Tamil Nadu and Gujarat coasts, in the Thar and on the Deccan plateau.
- Offshore: The Gulf of Khambhat and the sea off southern Tamil Nadu lead, with a target of 30 GW by 2030.
- Complementarity: Wind complements solar, the basis of the National Wind-Solar Hybrid Policy (2018).
Reasons for limited spatial spread
- Wind regime: Winds funnel through the Palghat and Shencottah gaps and the Aralvaimozhi pass that feeds Muppandal, while the Gangetic plain and the Northeast have weak winds.
- Grid and seasonality: Wind-rich districts are far from load centres and transmission lags despite the Green Energy Corridors; most output comes in May–September.
- Finance and policy: The 2017 shift from feed-in tariffs to reverse auctions pushed tariffs to about Rs 2.5 per unit and squeezed margins.
- Ecology: In 2021 the Supreme Court ordered power lines to be laid underground in Great Indian Bustard habitat in Rajasthan and Gujarat.
Since then
- Update: NIWE in 2023 raised the estimate to about 1,164 GW at 150 m, and in March 2024 the Supreme Court revisited its bustard order.
Spreading wind needs taller turbines for low-wind sites, repowering of old farms, hybrids with storage, inter-state transmission and timely DISCOM payments if it is to serve India's 500 GW non-fossil target for 2030.
Read more — sources
- OfficialMinistry of New and Renewable Energy — Annual Report 2021-22 (wind power)
- OfficialNational Institute of Wind Energy — Indian Wind Potential Map (120 m)
- NCERTIndia: People and Economy (Class XII) — Ch. 5, Mineral and Energy Resources