What is the main task of India’s third moon mission which could not be achieved in its earlier mission? List the countries that have achieved this task. Introduce the subsystems in the spacecraft launched and explain the role of the ‘Virtual Launch Control Centre’ at the Vikram Sarabhai Space Centre which contributed to the successful launch from Sriharikota.
A multi-part question: identify the task, list the countries, describe the subsystems and explain how the VLCC worked. Each part must be answered directly; Explain asks for the how and why, not just a name.
Common trap: Many answers describe Chandrayaan-3 in general and skip the VLCC or the country list. Top answers name the missing task precisely (a soft landing, near the south pole) and keep the three modules and their payloads distinct.
SyllabusAwareness in the fields of IT, Space, Computers, robotics, nano-technology, bio-technology and issues relating to intellectual property rights.
Model answer
15 marks · 250-word limitOn 23 August 2023 the Vikram lander of Chandrayaan-3 touched down near the lunar south pole, achieving the soft landing that Chandrayaan-2's lander could not manage in September 2019, when it crashed during its final descent.
- LVM3-M4 launch from Sriharikota, 14 July 2023
- Earth-bound orbit raising, then trans-lunar injection
- Lunar orbit insertion, 5 August 2023
- Propulsion module releases lander in lunar orbit
- Powered descent and soft landing, 23 August
- Pragyan rover rolls out for in-situ study
Main task and countries that have achieved it
- The unfinished task: A safe soft landing and rover operation on the Moon; Chandrayaan-2's orbiter succeeded in 2019 but the Vikram lander lost control in the last phase of descent.
- Countries with a soft landing: The Soviet Union (Luna 9, 1966), the United States (Surveyor 1, 1966; crewed Apollo landings from 1969) and China (Chang'e 3, 2013) had done it before India.
- India's distinction: India became the fourth country to soft-land on the Moon and the first to do so near the south polar region, where water ice is expected in permanently shadowed craters.
Subsystems of the spacecraft
| Module | Role | Key payloads |
|---|---|---|
| Propulsion module | Carried the lander to a 100 km circular lunar orbit, then stayed in orbit | SHAPE, to study Earth's spectral signature as a habitable planet |
| Vikram lander | Autonomous powered descent with stronger legs, more fuel, extra solar panels and a Laser Doppler Velocimeter | ChaSTE (soil temperature), ILSA (seismic activity), RAMBHA-LP (plasma) and NASA's passive laser retroreflector |
| Pragyan rover | Six-wheeled rover released from the lander's ramp | APXS and LIBS for elemental composition; LIBS confirmed sulphur near the pole |
Role of the Virtual Launch Control Centre
- What it is: A facility at VSSC, Thiruvananthapuram, built during the Covid-19 period, that copies the launch control systems at Sriharikota so vehicle checks can be run from a distance.
- How it helped: VSSC teams, who design the LVM3 vehicle, could run and monitor pre-launch checks on the vehicle's electronics and systems remotely. The final launch commands still came from Sriharikota.
- Why it matters: It cut the number of people who had to travel to and stay at the launch site and put design experts directly in the loop. This brought both safety and efficiency to the LVM3-M4 campaign.
Chandrayaan-3 turned the lessons of 2019 into a robust lander design and added a networked way of preparing launches. Its south-polar data and the confidence it brings to landings feed directly into Gaganyaan and future sample-return and resource missions.
Read more — sources
- OfficialISRO — Chandrayaan-3 mission pages and press releases, July–September 2023
- OfficialVSSC — LVM3-M4 / Chandrayaan-3 mission brochure
- OfficialPIB releases on the Chandrayaan-3 landing and National Space Day, August 2023
Related questions from earlier years
More from GS Paper 3 2023
Model answer by the EdiShorts editorial team. It is one well-argued treatment of the question, written to the official word limit — not an official UPSC answer key.