What is the need for expanding the regional air connectivity in India? In this context, discuss the government’s UDAN Scheme and its achievements.
First justify why regional air connectivity matters, then examine UDAN's design and record with figures, including where it has fallen short.
Common trap: Answers often praise UDAN with no mechanism or numbers. Explain the viability gap funding model and give achievement figures, and note the sustainability problem of routes once support ends.
SyllabusInfrastructure: Energy, Ports, Roads, Airports, Railways etc.
Model answer
15 marks · 250-word limitIndia is the world's third-largest domestic aviation market, yet air travel long stayed confined to metro routes. The Regional Connectivity Scheme, UDAN (Ude Desh ka Aam Nagrik), launched under the National Civil Aviation Policy 2016, set out to make flying affordable from unserved and underserved airports.
- Airline bids for an unserved route
- Fare capped on a share of seats
- Viability gap funding for three years
- Centre, state and airport concessions
- Route matures into a commercial service
Need for regional air connectivity
- Geography: Hill states, the North East and island territories have difficult terrain where roads and railways are slow, costly or seasonal.
- Balanced growth: Air links to tier-2 and tier-3 towns draw investment, tourism and jobs away from congested metros.
- Time-sensitive cargo and emergencies: Perishables, medicines and disaster relief need fast links, as Lifeline UDAN showed during the COVID-19 lockdown of 2020.
- Idle assets: Many airstrips built earlier lay unused, and a rising middle class wanted affordable flights.
UDAN: design
- Capped fares: A share of seats on each route is sold at capped fares, originally about Rs 2,500 for a one-hour flight.
- Viability gap funding: Support for three years is shared 80:20 between the Centre and states, and 90:10 for the North East and Union Territories, funded partly by a levy on flights on major routes.
- Concessions: States provide land, security and reduced VAT on aviation turbine fuel, and the Airports Authority of India waives landing and parking charges.
- Expanding versions: Later rounds added helicopters, seaplanes and priority areas, along with Krishi UDAN (2020) for farm produce.
Achievements and limitations
- Reach: From the first flight on the Shimla–Delhi route on 27 April 2017, by October 2024 over 600 routes and more than 85 aerodromes, including heliports and water aerodromes, had been operationalised, carrying over 1.4 crore passengers.
- Airport growth: Operational airports rose from 74 in 2014 to over 150 by 2024, with new airports in places such as Darbhanga, Jharsuguda and Kushinagar.
- Limitations: The CAG's 2023 performance audit found that many awarded routes never started or closed once viability gap funding ended, owing to poor demand assessment, airport readiness and aircraft shortages.
- Since then: The Union Budget 2025-26 announced a modified UDAN to connect 120 new destinations and carry 4 crore passengers over ten years.
UDAN has democratised flying and stitched remote regions into the national economy. Its next phase must focus on route sustainability through realistic demand mapping, small aircraft fleets, ATF rationalisation and integration with tourism and cargo, so that connectivity outlives subsidy.
Read more — sources
- OfficialMinistry of Civil Aviation — National Civil Aviation Policy 2016 and RCS-UDAN scheme document
- OfficialPIB releases on UDAN's achievements (2024)
- ReportComptroller and Auditor General of India — Performance Audit of the Regional Connectivity Scheme UDAN (2023)
- NCERTIndia: People and Economy (Class XII) — Ch. 7, Transport and Communication
Related questions from earlier years
More from GS Paper 3 2024
Model answer by the EdiShorts editorial team. It is one well-argued treatment of the question, written to the official word limit — not an official UPSC answer key.