Give an account of the growth and development of nuclear science and technology in India. What is the advantage of fast breeder reactor programme in India?
Give an account asks for an ordered, factual narrative of how the field developed; the second part needs a reasoned case for why fast breeders matter specifically to India.
Common trap: Most answers list reactors without a thread. A top answer organises growth around Bhabha's three-stage logic, covers non-power uses, and explains the breeder advantage through India's scarce uranium and abundant thorium.
SyllabusScience and Technology- developments and their applications and effects in everyday life. Achievements of Indians in science & technology; indigenization of technology and developing new technology.
Model answer
15 marks · 250-word limitIndia's nuclear journey began with the Atomic Energy Act, 1948 and Homi Bhabha's plan to turn modest uranium and vast thorium reserves into long-term energy security. By 2017 the country ran 22 power reactors with 6,780 MWe of capacity, built largely on indigenous technology despite decades of sanctions.
- 1948Atomic Energy Commission set up
- 1956Apsara, Asia's first research reactor
- 1969Tarapur, first nuclear power station
- 1974Pokhran-I peaceful nuclear explosion
- 1985Fast Breeder Test Reactor, Kalpakkam
- 1998Pokhran-II tests
- 2008NSG waiver ends isolation
- 2017Fleet-mode approval for 10 PHWRs
Growth and development
- Institutional base: The Department of Atomic Energy (1954), BARC at Trombay, NPCIL (1987) and the AERB (1983) created research, operating and regulatory arms.
- Indigenous reactor line: After Tarapur's US-built boiling water reactors and the Canadian-aided Rawatbhata units, India standardised its own 220 MWe and then 540 MWe pressurised heavy water reactors (PHWRs).
- Strategic capability: Pokhran-I (1974) and Pokhran-II (1998) brought sanctions but also forced self-reliance in fuel, heavy water and reprocessing.
- Opening up: The 2008 India-US civil nuclear agreement and NSG waiver allowed uranium imports from suppliers such as Kazakhstan and Russia; the Civil Liability for Nuclear Damage Act, 2010 and the Atomic Energy (Amendment) Act, 2015 followed.
- Non-power applications: Radioisotopes for cancer therapy (BARC's Bhabhatron), radiation-induced crop varieties, food irradiation and desalination; India also joined ITER in 2005.
Three-stage programme and the place of the breeder
| Stage | Reactor | Fuel cycle |
|---|---|---|
| I | PHWR | Natural uranium yields plutonium |
| II | Fast breeder (FBTR, PFBR) | Plutonium burns, breeds more fissile material; thorium blanket yields U-233 |
| III | Thorium-based reactors (AHWR design) | Thorium–U-233 cycle for centuries |
Advantages of the fast breeder programme
- Multiplies scarce uranium: Breeders produce more fissile fuel than they consume and use depleted uranium left by PHWRs, stretching India's limited uranium many times over.
- Gateway to thorium: A thorium blanket converts fertile thorium into U-233, unlocking India's large monazite reserves along the Kerala, Tamil Nadu and Odisha coasts.
- Closed fuel cycle: Reprocessing spent fuel shrinks long-lived waste and reduces import dependence.
- Low-carbon baseload: Breeder capacity supports India's Paris pledge of 40 percent non-fossil power capacity by 2030.
- Status: The 500 MWe PFBR by BHAVINI, under construction since 2004, was delayed; since then it attained first criticality in April 2026.
India is one of few countries to pursue the full fuel cycle from mining to breeders. Timely completion of the PFBR, fleet-mode PHWRs and strong independent regulation will decide whether Bhabha's thorium vision becomes a source of clean, secure power.
Read more — sources
- OfficialDepartment of Atomic Energy — Annual Report 2016-17
- OfficialUnion Cabinet decision of 17 May 2017 on 10 indigenous 700 MWe PHWRs in fleet mode (PIB)
- OfficialAtomic Energy Act, 1962 and Civil Liability for Nuclear Damage Act, 2010
- OfficialNuclear Power Corporation of India Ltd — nuclear power plants in operation, 2017
Related questions from earlier years
More from GS Paper 3 2017
Model answer by the EdiShorts editorial team. It is one well-argued treatment of the question, written to the official word limit — not an official UPSC answer key.