EdiShorts

UPSC Prelims 2024 CSAT Q8 · Numeracy

Year2024
PaperCSAT
QuestionQ8
SubjectNumeracy

X, Y and Z can complete a piece of work individually in 6 hours, 8 hours and 8 hours respectively. However, only one person at a time can work in each hour and nobody can work for two consecutive hours. All are engaged to finish the work. What is the minimum amount of time that they will take to finish the work?

  1. a6 hours 15 minutes
  2. b6 hours 30 minutes
  3. c6 hours 45 minutes
  4. d7 hours
Show answer & explanationHide answer
Correct answer(c) 6 hours 45 minutes

The total work of 24 units is completed in 6 hours 45 minutes when the fastest worker X works on alternate hours starting from the first hour.

Statement-by-statement analysis

✗ Option (a)
  • In 6 hours 15 minutes, maximum work completed is 21 units plus 4 multiplied by 15/60 units, which equals 22 units.
  • This is less than the required 24 units of total work.
✗ Option (b)
  • In 6 hours 30 minutes, maximum work completed is 21 units plus 4 multiplied by 30/60 units, which equals 23 units.
  • This falls short of the total work by 1 unit.
✓ Option (c)
  • Let total work be LCM of 6, 8, 8 which is 24 units. Hourly rates are X = 4 units/hr, Y = 3 units/hr, Z = 3 units/hr.
  • To minimize time, X must work in hours 1, 3, 5, and 7 while Y or Z work in hours 2, 4, and 6.
  • In the first 6 hours, work completed is 4 + 3 + 4 + 3 + 4 + 3 = 21 units.
  • Remaining 3 units are completed by X in the 7th hour taking 3/4 hour, which is 45 minutes, giving total time 6 hours 45 minutes.
✗ Option (d)
  • 7 hours would be required if Y or Z started the work in the first hour instead of X.
  • Since the question asks for the minimum amount of time, starting with X gives a faster completion time of 6 hours 45 minutes.

Concept to know

  • Total Work Assumption: Assume the total work as the Least Common Multiple (LCM) of individual times to get simple integer rates of work per unit time.
  • Hourly Efficiency Calculation: Determine individual work rate per hour by dividing total work by individual completion time.
  • Optimization Strategy: To minimize completion time, engage the worker with the highest efficiency as frequently as the constraints allow.
  • Alternate Work Pattern: Apply constraints such as non-consecutive working hours by alternating the fastest worker with other available workers.
  • Fractional Time Calculation: Calculate the remaining fractional time by dividing the remaining units of work by the hourly rate of the final worker.

Related facts for revision

  • Alternate Day Work Problems: Questions where workers work on rotation on successive days.
  • Pipes and Cisterns Alternate Operation: Problems where inlet and outlet pipes operate in turns.
  • Work Scheduling under Constraints: Problems involving rest periods or maximum shift lengths.
  • Cyclic Work Completion: Calculating progress per full cycle and handling the remainder in the incomplete final cycle.
How UPSC tests this

Ability to optimize work schedules under non-consecutive working constraints.

Trap: Starting the cycle with Y or Z instead of X, which leads to 7 hours instead of the optimal 6 hours 45 minutes.