A person X can complete 20% of work in 8 days and another person Y can complete 25% of the same work in 6 days. If they work together, in how many days will 40% of the work be completed?
- a6
- b8
- c10
- d12
Show answer & explanationHide answer
Correct answer(a) 6
Working together, X and Y have a combined rate of completing 1/15th of the work per day, which means completing 40% of the work takes exactly 6 days.
Statement-by-statement analysis
✓ Option (a)
- X completes 20% work in 8 days, so X completes 100% work in 8 x (100/20) = 40 days.
- Y completes 25% work in 6 days, so Y completes 100% work in 6 x (100/25) = 24 days.
- Combined work done by X and Y in 1 day = 1/40 + 1/24 = 8/120 = 1/15 of the total work.
- Time for 100% work = 15 days, so time for 40% work = 15 x 0.40 = 6 days.
✗ Option (b)
- 8 days is the time taken by X alone to complete just 20% of the work, not 40% of the work done together with Y.
✗ Option (c)
- 10 days is an incorrect value resulting from miscalculating the combined rate or taking simple arithmetic averages of days.
✗ Option (d)
- 12 days is the time taken by Y alone to complete 50% of the work, not the time taken by X and Y together to complete 40% of the work.
Concept to know
- Time and Work problems rely on the basic relationship: Work Done = Rate of Work x Time Taken.
- If a person completes P percent of work in D days, total time required for 100 percent work is D x (100 / P) days.
- Individual daily efficiency is represented as 1 divided by the total number of days taken to complete 100 percent of the work.
- When persons work together, their individual daily rates are added to find the net daily rate: Net Rate = Rate of X + Rate of Y.
- To find time taken for a specific fraction of work, multiply the time required for complete work by that fraction.
Related facts for revision
- LCM method where total work is assumed as the LCM of 40 and 24, which is 120 units.
- Efficiency ratio concepts where work done per day is inversely proportional to time taken.
- Alternate days work concepts where workers perform duties on successive days rather than simultaneously.
How UPSC tests this
Calculating combined work completion rates from fractional work percentages.
Trap: Calculating the total time for 100% work (15 days) and forgetting to multiply by 0.40 to get the time for 40% work.
← Previous · Q70As a result of 25% hike in the price of rice per kg, a person is able to…Next · Q72 →A car travels from a place X to place Y at an average speed of v km/hr, from Y…
More Numeracy PYQs
How many words can one form by shuffling the letters of the word QUEUE, if Q is always followed by U? The words thus formed need not necessarily have any meaning.
See the answer & explanation →
X, Y and Z jump forward 4', 6' and 5', respectively. At 8 AM, they all land on mark 199'. How many times will they all land on the same mark (need not be at the same moment) between mark 195' and 1000', if all of them cross mark…
See the answer & explanation →
A toy T jumps forward or backward. In each forward jump, it moves 5' forward whereas in each backward jump, it moves 2' backward. If in 31 jumps, T moves exactly 15' forward, then what is the difference of the number of forward…
See the answer & explanation →
If 10^m × 1000 × n = 75^25 × 25^32 × 32^75, where n is not divisible by 10, then the value of m is
See the answer & explanation →Answer from the official UPSC answer key. Explanation by the EdiShorts editorial team.